The Building 8 Extension Project developed for Mercedes-Benz Türk A.Ş. at the Hoşdere Facilities was completed by DEA YAPI on a 4,000 m² construction area on a turnkey basis in 2012. The project, involving the addition of a new floor to the existing building, was delivered through integrated execution of reinforced concrete structural systems, silicone façade, finishing works, and electrical-mechanical installations.

Constructing an additional floor on an active production facility requires specialized engineering discipline. Core priorities included reanalyzing the load-bearing capacity of the existing structure, maintaining uninterrupted production flow, and enforcing the highest standards of occupational safety. The silicone curtain wall system ensured aesthetic continuity, while finishing works, mechanical-electrical installations, and HVAC systems were completed in compliance with international automotive industry standards.

The Hoşdere Facilities of Mercedes-Benz Türk represent one of Türkiye’s leading bus manufacturing centers, operating at the heart of export production to European markets. Working within an active facility of this scale demands exceptional rigor in quality control, scheduling, and environmental safety.

Since 1988, DEA YAPI has maintained a long-standing partnership with Mercedes-Benz Türk, bringing its technical discipline in industrial building construction and turnkey project management expertise to this extension project as well.